TM 9-2350-277-20-5
REPAIR COOLANT HEATER CONTROL BOX Continued
0737 00
NOTE
Start switch has locked RUN position and spring-loaded START position.
3.
Install RUN-OFF-START switch in control box:
a.
Install switch (9) in control box (2) with locked position at the top. Secure with two screws (10).
b.
Install lead 19-E (11), lead 19-2 (12), jumper 21-14 (13), jumper 21-18 (14), lead 14-A (15), lead 20-C (16),
jumper 13-20 (3), and jumper 15-17 (17) on RUN-OFF-START switch (9). Secure with six lockwashers (18) and
screws (19).
0737 00-9