TM 9-2350-277-20-5
INSPECT POWER PLANT SLING
0673 00
THIS WORK PACKAGE COVERS:
Periodic Check (page 0673 00-2).
Preoperative Check (page 0673 00-8).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanics Tool Kit (WP 0926 00, Item 65)
Drill Set (WP 0926 00, Item 18)
Measuring Tape (WP 0926 00, Item 58)
Suitable Lifting Device
Personnel Required
Unit Mechanic
Equipment Condition
Sling suspended from suitable lifting device
0673 00-1