TM 9-2350-277-20-5
REPLACE RAMP CYLINDER BREATHER HOSE (ALL EXCEPT M1064A3)
0666 00
THIS WORK PACKAGE COVERS:
Removal (page 0666 00-1).
Installation (page 0666 00-3).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanics Tool Kit (WP 0926 00, Item 65)
Materials/Parts
Sealing compound (WP 0928 00, Item 56)
Locknut
Lockwasher (3)
Personnel Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Rear floor plate removed (WP 0539 00)
REMOVAL
1.
Remove three screws (1), lockwashers (2), and clamps (3) from hull and bulkhead weldnuts. Discard lockwashers.
2.
Remove screw (4), washer (5), locknut (6), and two clamps (7)(8) from bilge pump pipe (9) and breather hose (10).
Discard locknut.
0666 00-1