TM 9-2350-277-20-3
REPLACE COOLANT TEMPERATURE TRANSMITTER Continued
0321 00
INSTALLATION
1.
Coat threads of switch (2) with sealing compound.
2.
Install switch (2) in thermostat housing (3).
3.
Connect circuit 33 lead (1) to switch (2).
FOLLOW-THROUGH STEPS
1.
Fill coolant system to proper level (WP 0227 00).
2.
Start engine (see your -10).
3.
Check for leaks (see your -10).
4.
Stop engine (see your -10).
5.
Install power plant upper rear access panel (see your -10).
END OF TASK
0321 00-2