TM 9-2350-277-20-3
REPLACE/REPAIR DISTRIBUTION BOX (M981A3 ONLY) Continued
0273 00
NOTE
If replacing any grommet, split grommet before installation.
21. Install 10 grommets in front cover.
22. Position 10 catches (1) on front cover and install 20 screws (2), new lockwashers (3), and nuts (4).
23. Install four clips (5) to front cover with eight rivets (6).
24. Route AUX PWR J1 lead (7) and attached grommet through opening in face of front cover and install grommet to front
cover.
25. Position AUX PWR receptacle J1 (8) in front cover.
26. Install four screws (9), washers (10), and new locknuts (11) securing assembly J1 (8) to front cover.
27. Position VEHICLE BAT switch S1 (12) in front cover. Install two screws (13), washers (14), and new locknuts (15).
28. Position handle (16) on VEHICLE BAT switch stem and install screw (17).
29. Position EQPT BAT voltmeter M1 (18) in front cover and slide retainer (19) in place over back mounting studs.
30. Install two lockwashers (20) and nuts (21).
31. Position EQPT BAT switch S2 (22) in front cover. Install two screws (23), washers (24), and new locknuts (25).
32. Position handle (26) on EQPT BAT switch stem and install screw (27).
33. Position EMERGENCY switch S3 (28) in front cover. Install two screws (29), washers (30), and new locknuts (31).
34. Position handle (32) on EMERGENCY switch stem and install screw (33).
35. Position UTILITY socket J2 (34) in cover. Install screw (35), washer (36), new lockwasher (37), and nuts (38).
TORQUE NUT TO 6.5 +/- 0.5 LB-IN. (0.73 +/- 0.06 N m).
36. Screw socket cap (39) on UTILITY socket J2 (34). Install screw (40), washer (41), chain (42), and new lockwasher (43).
Connect lead (44) to screw (40) and install new lockwasher (45) and nut (46). TORQUE NUT TO 6.5 +/- 0.5 LB-IN.
(0.73 +/- 0.06 N m).
0273 00-13