TM 9-2350-277-20-3
REPLACE DISTRIBUTION BOX (M113A3, M901A3, M1059A3, M1064A3, AND M58 ONLY)
Continued
0269 00
4.
Install grommet (15) on circuit lead 2 (16) and grommet (17) on circuit lead 2A (18). Route leads into distribution box
(8), and install grommets in box.
NOTE
Step 5 applies to M113A3 carriers with water/ration heater kit installed only.
5.
Install circuit lead 222B (25) and grommet (26) in distribution box (8).
6.
Install lead 400 (19) in distribution box (8).
7.
Install circuit leads 27E, 10, 15 (20), 450A (21), and grommet (22) in distribution box (8). Secure with screw (23) and
new lockwasher (24).
FOLLOW-THROUGH STEPS
1.
Install master switch panel (WP 0260 00).
2.
Connect battery ground strap (WP 0337 00).
END OF TASK
0269 00-5/6 blank