TM 9-2350-277-20-2
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INCLUDING
LUBRICATION INSTRUCTIONS Continued
0155 00
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED OR
SERVICED
CREWMEMBER
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE
IF:
97
Semi-
Annual
Personnel
Heater Kit
a. Tighten loose mounting screws and clamps.
Any fuel,
coolant, or
exhaust leaks.
b. Remove control cover by turning two screws to
the left.
MOUNTING
SCREWS
MOUNTING
SCREWS
CLAMP
CONTROL
COVER
SCREWS
0155 00-161