TM 9-2350-277-20-2
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INCLUDING
LUBRICATION INSTRUCTIONS Continued
0155 00
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED OR
SERVICED
CREWMEMBER
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE
IF:
49
Semi-
Annual
Electrical
Connectors and
Leads
a. Check electrical connectors for looseness or
broken contact. Replace broken connectors
(WP 0382 00).
b. Check that electrical leads in power plant
compartment are not frayed, cut, or broken. If
leads are damaged, identify damaged lead. Go
to the Table of Contents for electrical lead/
harness connectors repairs and locate the
specific task to repair or replace the damaged
lead or wiring harness.
ELECTRICAL CONNECTORS
ELECTRICAL
CONNECTORS
ELECTRICAL LEADS
50
Semi-
Annual
0.5
Drive Shafts and
Universal Joints
NOTE
See Step 1g under General Maintenance
Instructions for proper use of torque
wrench adapter.
a. Check for loose or missing screws and
lockwashers on universal joints. Tighten loose
screws to 86-92 lb-ft (117-127 N m) torque. Use
torque wrench (WP 0926 00, Item 79) and
adapter (WP 0926 00, Item 4).
Any hardware
is loose,
broken, or
missing.
0155
00-96