TM 9-2350-277-20-2
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INCLUDING
LUBRICATION INSTRUCTIONS Continued
0155 00
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED OR
SERVICED
CREWMEMBER
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE
IF:
21
Semi-
Annual
Torsion Bar
Anchors/
Splines/End
Plugs
a. Remove floor plates (see Table of Contents).
Any broken,
bent, missing,
stripped
torsion bars or
attaching
hardware.
b. Check plugs. Be sure they are fully seated.
Tighten plugs to 50-75 lb-ft (68-102 N m). Use
torque wrench (WP 0926 00, Item 79).
0155 00-70