13-8
Change 4
TM 9-2350-267-34
PROJECTILE RACK ASSEMBLY: REPAIR (Continued)
J
K
L
Install right handle (3) and left handle (4) and tighten two sets-
crews (5) on each handle.
Secure handles (3 and 4) with screw (1) and new self-locking nut (2) for each
handle.
Perform projectile rack pull test (p 13-9).