10-2.16
Change 4
TM 9-2350-267-34
WINTERIZATION KIT: INITIAL INSTALLATION (CONTINUED)
BQ
BR
BS
Slide rear insulation blanket (150) over batteries. Guide free end of rear
batteries ground lead (circuit 7) (149) through grommet (151) in blanket
and position rear of blanket under rear winterization box tab (152).
Place front insulation blanket (153) over batteries, position outer side of
blanket under rear winterization box side tab (154) and position slot on
imer side of blanket over stud (155) on front box. Install flat washers and
wing nut on stud.
Install rear batteries ground lead (circuit 7)(149) on bulkhead with two
existing screws and two lockwashers. Reroute left headlight wiring
harness (156) and place on top of blankets (150) and (153).
BT
BU
Install engine coolant drain plug (157) and gasket (158) in lower main
coolant tube (159).
Fill engine coolant system to FULL level in accordance with vehicle
article preparation procedures and air bleed note at end of this section.