5-26
VANE AXIAL COOLING FAN ASSEMBLIES REPAIR (CONTINUED),
F
Using dimensions recorded in Steps A, B, C and E, compute shim
thickness:
(2) Required shim thickness = 0.757 - X
TM 9-2350-267-34
NOTE
Use shim thickness computed in Step F.
I
Assemble gear box by reversing order of disassembly.
J
Pack gear box housing (26) 90% full of grease.
K
Install new gasket (44).
L
Install cover (43) and 12 socket head screws (42).
G Remove locknut (28), key washer (27) and bearing (30) from retainer
and shaft assembly (41).
H Install new key washer (27).
TA309759