• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
OPERATING THE STACKER
OPERATING THE STACKER - Continued - TM-9-2350-267-10_202

TM-9-2350-267-10 Carrier Personnel Full Tracked Armored M113A2 2350-01-068-4077 Carrier Command Post Light Tracked M577A2 2350-01-068-4089 Manual
Page Navigation
  182    183    184    185    186  187  188    189    190    191    192  
TM 9-2350-267-10 OPERATING THE STACKER - Continued Using  Stacker  to  Unload  Projectiles 1. 2. 3. Turn  on  hydraulic  system  (p  2-129). Prepare  conveyor  for  operation  (p  2-148). Remove  quick-release  pin  (1)  securing  restraint  bar  (2)  to  stacker  vertical  col- Pivot  restraint  bar  downward  to  a  position  beside  canister  compart- Reinsert  quick-release  pin  through  restraint  bar  (2). umn. ment. WARNING To avoid injury, never operate stacker without chain guards  (3)  in  place. 4. Unlock appropriate projectile rack (p 2-184). 2-167







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.