TM 9-2350-261-20-4
REPLACE M13 NBC HEATERS AND MOUNTS (M577A2 ONLY) -- Continued
0672 00
INSTALLATION
1.
Install operator's heaters (1), (2), and (3) on welded mounts (4), (5), and (6). Secure each heater with four screws (7),
eight washers (8), and four new locknuts (9).
2.
Install inlet and outlet hoses (10) and (11) and two clamps (12) on operator's heater (1). Tighten clamps.
3.
Install inlet and outlet hoses (13) and (14) and two clamps (15) on operator's heater (2). Tighten clamps.
4.
Install inlet and outlet hoses (16) and (17) and two clamps (18) on operator's heater (3). Tighten clamps.
5.
Install circuit 537C lead (19) on operator's heater (1), circuit 537D lead (20) on operator's heater (2), and circuit 537E
lead (21) on operator's heater (3).
NOTE
6.
Install hose (22) and circuit 579C lead (23) in frame (24).
7.
Install frame on welded molding with six screws (25), 12 washers (26), and six new locknuts (27).
8.
Install bracket (28) with switch assembly (29) on frame (24). Secure with two screws (30), four washers (31), and
two new locknuts (32).
9.
If either grommet (33) was removed, install new grommet on hose (34).
10. Install hose (34) with grommets (33) on frame (24).