TM 9-2350-261-20-2
22.
23.
Install power receptacle (1) in master switch 25.
panel (2). Secure with four screws (3) and
nuts (4).
Install new grommet (5) on ground
Route lead out of panel (2). Install
in panel.
Place lead (6) on instrument panel
hull mount, Secure with screw (7),
(8), and nut (9).
lead (6). 26.
grommet
strut
27.
washer
Install circuit 50 lead (10) on terminal of
master switch (11). Secure with new
lockwasher (12) and nut (13).
Place circuit 49 lead (14) on terminal on
lead (10). Secure with screw (15), two
washers (16), and nut (17).
Place master switch panel (2) on distribution
box. Secure with eight screws (18), washers
(19), and eight new locknuts (20).
9-5
24.
F O L L O W - T H R O U G H S T E P S
1. Connect battery ground lead (page 13-2).