TM 9-2350-261-20-2
INSTALL
7.
8.
9.
10.
11.
Apply thin coat of sealing compound
(Item 48) to both sides of new gasket (1).
12.
Install new gasket (1), filler neck (2), and
bracket (3) on auxiliary tank (4). Secure
with four screws (5), flat washers (6), and
13.
new lockwashers (7).
Secure chain (8) to bracket (3) and filler
cap (9) with two hooks (10).
Install filler cap (9) in filler neck (2).
14.
Apply thin coat of sealing compound
(Item 46) to external threads of adapter
(11) and two elbows (12).
Install adapter (11) and two elbows (12) in
auxiliary tank (13).
Secure auxiliary tank (4) to power plant
grill with four screws (13) and
washers (14). Tighten screws to
264-288 il-in (3033 N-m) torque. Use
torque wrench and socket wrench set.
Secure three hoses (15) to auxiliary tank (4)
with three clamps (16).
FOLLOW-THROUGH STEPS
1. Lower power plant grill (page 5-2).
3. Stop/shutdown engine (see your -10).
2. Start engine (see your -10). Check for leaks.
END OF TASK
8-29