21. Connect three wiring harness connectors (1)
to receptacles on drivers compartment bulk-
head.
22. Install wiring harness (2) on transmission
crossshaft bracket (3). Secure with two
clamps (4) and screws (5).
FOLLOW-THROUGH STEPS
1.
2.
3.
4.
Adjust transmission cross-shaft linkage
(page 23-34).
Install hull bottom access cover(page
24-32).
6.
Install air control valve (page 7-11).
7.
Install air cleaner housing and element
Install drivers power plant access panel
(page 24-25).
Close power plant tint access door and raise
trim vane (see your -10).
Operate carrier (see your -10). Check that
transmission cross-shaft linkage operates
properly.
END OF TASK