17.
18.
Install steering levers, bracket, and shim
19.
(page 23-7).
Adjust brake locking pawl (page 234).
20.
TM 9-2350-261-20-2
Lubricate cross-shafts (1 and 2) and arm
bearing (3) (see your LO).
Connect two return springs (page 23-2).
FOLLOW-THROUGH STEPS
1.
2.
3.
4.
Install oil can bracket (page 24-237).
5.
Install air cleaner housing and element
6.
(page 7-7).
7.
Close power plant front access door and raise
trim vane (see your -10).
8.
Install drivers power plant access panel
Install drivers seat (page 24-127).
Raise and lock ramp (see your -10).
Operate carrier (see your -10). Check that
the steering operates properly.
Stop/shutdown engine (see your -10).
(page 24-25).
END OF TASK
23-13