TM 9-2350-261-20-2
I N S T A LL
N O T E
If arm bearing (1) is to be replaced, use
shim (2) as a template to locate and drill
two .250-.252 inch (6mm) holes in base of
new bearing before installation. If there is
no shim, make template from old bearing.
11.
12.
Assemble cross-shafts (3 and 4), arm bear-
ing (1), lube fittings (5), and two thrust
washers (6) as a unit. Install through power
plant compartment bulkhead opening.
Place shim (2) and bearing (1) on bracket
(7). Secure with two new tapered pins (8),
new locknuts (9), washers (10), and
screws (11).
13.
14.
15.
16.
Install two clevises (12) on cross-shafts (3
and 4). Secure with two clevis pins (13,
washers (14) and new cotter pins (16).
Install new gasket (16) and covers (17 and
18) on five press nuts (19) in power plant
compartment bulkhead. Secure with five new
locknuts (20), screws (21), and wash-
ers (22).
Install bearing (23) in bracket (24). Secure
with two retaining rings (25). Use snap ring
pliers.
Install two quadrants (26) and stops (27) on
bracket (24). Secure with two screws (28)
and new locknuts (29).
23-12