TM 9-2350-261-20-2
INSTALL
8. If removed, install new grommet (1) in
master switch panel (2).
N O T E
Make sure receptacle cover retainer
chain is installed on lower screw.
9
10.
Place utility outlet receptacle (3) on rear of
master switch panel (2). Secure with two
new lockwashers (4) and screws (5).
Route utility outlet receptacle lead (6)
through grommet (1). Install shell connector
(7) and slotted washer (8).
11.
12.
Install master switch panel (2) on
distribution box (9). Secure with eight
screws (10), washers (11), and new
locknuts (12).
Connect circuit 37 lead (13) to utility recep-
tacle lead (14).
FOLLOW-THROUGH STEPS
1. Install warning light panel assembly
3. Turn MASTER SWITCH ON (see your -10)
(page 11-25).
to check that receptacle is installed properly.
Use multimeter.
2. Connect battery ground lead (page 13-2).
4. Turn MASTER SWITCH OFF see your -10).
END OF TASK
17-6