TM 9-2350-261-20-2
5.
6.
7.
8.
9.
Place two circuit breakers (1 and 2) in distri-
bution box (3). Secure with four screws (4)
and new locknuts (5).
Connect circuit 450C lead (6) and circuit
450B lead (7) to top bilge pump circuit
breaker (2).
Connect circuit 450A lead (8) and circuit 450
lead (9) to bottom bilge pump circuit
breaker (1).
Inspect gasket (10). Replace if damaged.
Place master switch panel (11) on distribution
box (3). Secure with eight screws (12),
washers (13), and new locknuts (14).
FOLLOW-THROUGH STEPS
1. Connect battery ground lead (page 13-2).
3. Turn on bilge pump switches to check that
bilge pump circuit breaker works properly
2. Turn MASTER SWITCH ON (see your -10).
(see your -10). Bilge pump lights should come
o n .
4. Turn all switches OFF (see your -10).
END OF TASK
16-13 (16-14 blank)