TM 9-2350-261-20-2
19. Install bracket (1) on weldnuts. Secure with
two new key washers (2) and screws (3).
20. On M106A2, M125A2, and M1064 place
strainer (4) on pump (5). Secure with
washer (6) and screw (7).
21. Connect circuit 451 lead (8) to bilge
pump (5).
FOLLOW-THROUGH STEPS
1. Connect battery ground lead (page 13-2).
4. Turn rear bilge pump switch off
(see your 10).
2. Turn MASTER SWITCH ON (see your 10).
5. Raise and lock ramp (see your 10).
3. Turn rear bilge pump switch on
(see your -10) and check pump. Put your
6. Stop/shutdown engine (see your -10).
hand over pump outlet. You should feel air
coming out. This means pump is working.
7. Install rear floor plates (page 24-40).
END OF TASK
16-10
Change 2