TM 9-2350-261-20-2
21. Install circuit 74A lead (1) and two new
24. Connect circuit 1B lead (10) to generator
lockwashers (2) on starter solenoid (3).
field switch (11) on secondary fuel filter.
Secure with nut (4).
22. Install circuit 6 lead (5) and two new
lockwashers (6) on solenoid (3). Secure with
nut (7).
23. Connect circuit 34 lead (8) to engine low oil
pressure switch (9).
FOLLOW-THROUGH STEPS
1. Connect battery ground lead (page 13-2).
5. Stop/shutdown engine (see your -10).
2. Install power plant rear access panel
(page 24-27, 24-29).
6. Close power plant front access door and raise
trim vane (see your -10).
3. Start engine (see your -10). Check that
power plant wiring harness operates properly.
7. Install power plant bottom access cover
(page 24-32).
4. Raise and lock ramp (see your -10).
END OF TASK
Change 4
15-13 (15-14 blank)