TM 9-2350-261-20-2
R E P L A C E B A T T E R Y B O X I N S U L A T I O N A N D H E A T E X C H A N G ER
( M 5 7 7 A 2 A N D M 1 0 6 8 O N L Y)
DESCRIPTION
This task covers:
Remove (page 13-35).
Clean, Inspect, and Repair (page 13-36).
Install (page 13-36).
INITIAL SETUP
Tools:
References:
General Mechanics Tool Kit (Item 30, App D)
See your -10
Materials/Parts:
Equipment Conditions:
Sealing Compound (Item 52, App C)
Engine stopped/shutdown (see your -10)
Sodium bicarbonate (Item 55, App C)
Carrier blocked (see your -10)
Grommet (2)
Ramp lowered (see your -10)
Carrier cooling system drained (page 8-3)
Personnel Required:
Coolant heater system drained (page 32-10)
Unit Mechanic
Batteries removed (page 13-16)
REMOVE
1.
2.
3.
4.
Loosen four clamps (1). Remove two hoses (2)
from two elbows (3). Remove two elbows from
two short hoses (4). Remove clamps.
Loosen two clamps (5) on heat exchanger (6).
Remove hoses (4) from heat exchanger.
Remove heat exchanger (6) and two
grommets (7) from battery box (8). Discard
grommets.
If damaged, remove insulation sheet (9) from
battery box cover (10).
GO TO NEXT PAGE
Change 3
13-35