TM 9-2350-261-20-2
FOLLOW-THROUGH STEPS
1.
2.
3.
Install battery access cover (page 13-6.1).
4. Start engine (see your -10).
Connect battery ground lead (page 13-2.
5. Raise and lock ramp (see your -10).
Turn MASTER SWITCH ON. Check
6. Turn MASTER SWITCH OFF (see your -10).
BATT-GEN gage on instrument panel. Gage
should read in BATT green or yellow zone
(see your -10).
END OF TASK
13-6.6
Change 3