TM 9-2350-261-20-2
101. Install clamp (1) and rear main wiring
harness (2) on bilge pump tube clamp (3).
Secure with screw (4) and nut (5).
102. Connect circuits 23 and 24 leads (6 and 7)
to right tail light (8).
FOLLOW-THROUGH STEPS
1.
2.
3.
Install rear floor plate (page 24-38).
Connect battery ground lead (page 13-2).
Turn MASTER SWITCH ON (see your -10).
4. Raise and lock ramp (see your -10).
5. Stop engine (see your -10).
Check that electrical system works- properly.
END OF TASK
12-118