TM 9-2350-261-20-2
28. Apply one coat of adhesive to cleaned
mounting surface of distribution box (1) and
one side of new gasket (2).
29. Install new gasket (2) on coated mounting
surface of distribution box ( 1).
FOLLOW-THROUGH STEPS
1. Install master switch panel fpage 9-22).
3. Start engine (see your -10). Check that
distribution box is operable.
2. Connect battery ground lead (page 13-2).
4. Stop engine (see your -10).
END OF TASK
12-27