TM 9-2350-261-20-2
CLEAN, INSPECT, AND REPAIR
5. Check circuit 49 lead for continuity. Use
multimeter. Replace bad lead.
INSTALL
6.
7.
Install two new grommets (2) on circuit 49
lead (l).
Route circuit 49 lead (1) through dristribution
box (4) and master switch panel (3). Install
new grommets (2) in box and panel.
8.
9.
10.
Install circuit 49 lead (1) on bus bar (5) of
distribution box (4). Secure with new
lockwasher (6) and screw
Install circuit 49 lead (1)
terminal (8). Secure with
new locknut (10).
(7).
on master switch
washer (9), and
Install master switch panel (3) on
distribution box (4). Secure with eight
screws (11), washers (12), and new
locknuts (13).
FOLLOW-THROUGH STEPS
1. Connect battery ground lead (page 13-2).
3. Check that circuit 49 lead is operational.
MASTER SWITCH light should come on.
2. Turn MASTER SWITCH ON (see your -10).
4. Turn MASTER SWITCH OFF (see your-10).
END OF TASK
9-50