TM 9-2350-261-20-2
R E P L A C E G E N E R A T O R A N D A D J U S T M E N T L I N K A GE
( 1 0 0 A M P G E N E R A T O R O N L Y)
DESCRIPTION
This task covers:
Remove (page 9-3 1).
Install (page 9-32).
INITIAL SETUP
Tools:
General Mechanics Tool Kit (Item 30, App D)
Socket Wrench Set (Item 89, App D)
Torque Wrench (Item 94, App D)
Materials/Parts:
Antiseize compound (Item 4, App C)
Key washer (2)
Lockwasher
Self-locking nut (6)
Self-locking nut (2)
Personnel Required:
Unit Mechanic
References:
see your -lo
Equipment Conditions:
Engine stopped/shutdown (see your 10)
Carrier blocked (see your -10)
Battery ground lead disconnected (page 13-2)
Power plant rear access panels and support
.-
removed (page 24-27) -
Generator drive belts removed (page 9-29)
REMOVE
1.
2.
3.
4.
5.
Discomect cable (1) from generator (2).
Remove locknut (3), screw (4), rod end (5),
and spacer (6) from generator (2). Discard
locknut.
Remove locknut (7), screw (8), rod end (9),
and spacer (10) from bracket (11). Discard
locknut.
Remove two rod ends (5 and 9) from turn-
buckle (12). Remove jam nut (13) from rod
end (9).
Remove three screws (14), two key washers
(15), lockwasher (16), flat washer (17), and
bracket (11) from transfer gearcase. Discard
key washers and lockwasher.
GO TO NEXT PAGE
9-31