INSTALL
5.
7.
Install exhaust pipe (1) in exhaust pipe (2).
N O T E
Step 6 is for the early system. Step 7 is for
the current system.
Install and secure exhaust pipes (1 and 2) on
engine exhaust manifolds (3 and 4) and
muffler joint (5) with two muffler joint
clamps (6).
Install exhaust pipe (1) on muffler joint (5).
Install and secure exhaust pipes (1 and 2) on
engine exhaust manifolds (3 and 4) with two
clamps (7) .
8.
9.
TM 9-2350-261-20-1
Tighten two clamps (7) to 204-216 lb-in
(23-25 Nm) torque. Use torque wrench
(Item 95) and socket wrench set (Item 89).
N O T E
Step 9 is for early system only.
Tighten two muffler clamps (6) to
36-60 lb-in (4-7 Nm) torque. Use torque
wrench (Item 99) and socket wrench set
(Item 88).
FOLLOW-THROUGH STEPS
1. Install air cleaner housing and element
(page 7-7).
W A R N I N G
Loose clothing is dangerous
around moving belts and
pulleys. You could get bad-
ly hurt if your clothes get
caught in moving parts.
2.
3.
4.
5.
Start engine (see your -10). Check for leaks.
Engine stopped/shutdown (see you -10).
Close power plant front access door
see your -10.
Raise trim vane (see your -10).
END OF TASK
7-17
6.