17. Install fuel hose (1) on engine block. Secure
19.
with screw (2), washer (3), and clamp (4).
20.
18. Install fuel hose (1) on engine block. Secure
with screw (5), washer (6), and clamp (7).
Connect fuel hose (1) to fuel return tee (8).
Connect supply and return quick disconnect
couplings (9) .
FOLLOW-THROUGH STEPS
1.
2.
3.
4.
5.
Install differential oil falter bracket
6.
(page 21-6).
7.
Install air control valve and guard
(page 7-11).
8.
Install air cleaner hose (page 7-3).
9.
Install air cleaner housing and element
(page 7-7).
10.
Connect battery ground lead (page 13-2).
Start engine (see your -10). Check for leaks.
Stop/shutdown engine (see your -10).
Install drivers power plant access panel
(page 24-25).
Install power plant rear access panel
(page 24-27 or 24-29).
Close power plant front access door and
raise trim vane (see your -10).
END OF TASK