Install two nipples (1) in transverse beam
and secure with two jamnuts.
Connect fuel supply hose (2) and fuel return
hose (3) on two nipples (1).
Install two tube assemblies (4) to two
nipples (1).
Install two elbows (5) to two tube
assemblies (4).
Connect two quick disconnect coupling halves
(6) to two elbows (5).
Connect two quick disconnect coupling halves
(7) to two quick disconnect coupling halves
(6) inside power plant bulkhead.
Connect fuel supply hose (2) and fuel return
hose (3) to 8 weldnuts (8) with 16 clamps
(9) and 8 screws (10).
FOLLOW-THROUGH STEPS
1. Connect battery ground lead (page 132).
5. Install floor plates (page 2440).
2. Fill fuel bladder (see your -10).
6. Install ammunition containers (page 24-199).
3. Start engine (see your 10). Check for leaks.
7. Raise and lock ramp (see your -10).
4. Install power plant rear access panel
(page 24-27).
8. Stop/shutdown engine (see your -10).
END OF TASK