Install nipple (1) and nut (2) on traverse
beam inside power plant rear bulkhead.
Connect tube assembly (3) to nipple (1).
Install elbow (4) on tube assembly (3).
Install quick disconnect half (5) on
elbow (4).
Connect fuel supply hose (6) to nipple (1).
Connect quick disconnect half (7) to quick
disconnect half (5) at power plant rear
bulkhead.
FOLLOW-THROUGH STEPS
1.
2.
3.
4.
Fill fuel tanks (see your -10).
5.
Connect battery ground leads (page 13-2).
6.
Start engine (see your 10). Check for leaks.
7.
Install power plant rear access panel
8.
(page 24-27).
9.
Install heater duct (page 29-47).
Install floor plates (page 24-38).
Raise and lock ramp (see your -10).
Stop/shutdown engine (see your -10).
Unblock earner (see your -10).
END OF TASK