FOLLOW-THROUGH STEPS
1.
2.
3.
4.
Install cargo area floor plates
5.
(See TM9-2350-266-20).
Fill fuel tanks (see your -10).
6.
Connect battery ground lead (page 13-2).
7.
Start engine (see your -10). Check for leaks.
Install power plant rear access panel
(page 24-27).
Raise and lock ramp (see your -10).
Stop/shutdown engine (see your -10).