TM 9-2350-261-20-1
R E M O V E A N D I N S T A L L P O W E R P L A NT
DESCRIPTION
This task covers: Remove (Page 5-11).
Install (Page 5-17).
INITIAL SETUP
Tools:
References:
General Mechanics Tool Kit (Item 30, App D)
Torque Wrench Adapter
(Items 7, 8 and 9, App D)
Engine and transmission sling
(Item 65, App D
Socket wrench set (Item 89, App D)
Torque Wrench (Item 96, App D)
Torque Wrench (Item 96, App D)
Materials/Parts:
see our - 10
see your -12
Equipment Conditions:
Engine stopped/shutdown (see your -10)
Carrier blocked (see your -10)
Battery ground lead disconnected (page 13-2)
Power plant rear access panels removed
(page 24-27 or 24-29)
Driver's power plant access panel removed
Key washer (2)
(page 24-25)
self-locking bolt (2)
Power plant bottom access cover removed
screw (4)
(page 24-32)
Washer (4)
All coolant drained (page 8-3)
Power plant grill raised (page 5-2
Personnel Required:
Fuel supply valve at tank closed
Unit Mechanic
Helper (H)
(see your -10)
Air control valve and housing assembly
removed (page 7-11)
REMOVE
1. Disconnect three electrical cables
drivers compartment bulkhead.
NOTE
On carriers with exhausts as
Figure A,go to step 3.
2.
(1) at
9.
shown in
Loosen two clamps (2) and remove pipe joint
(3) from muffler (4) and exhaust pipe (5).
Loosen two clamps (6). Remove exhaust
pipes (5 and 7).
GO TO NEXT PAGE
5-11