TM 9-2350-247-20-2
REPLACE FINAL DRIVE -- Continued
0326 00
7.
Secure final drive lifting bar (1) to final drive (2) with two sprocket mounting screws (3).
WARNING
Final drive is top heavy. Be careful when removing final drive lifting bar after installation. Use
helper to install final drive.
8.
Attach lifting device to final drive lifting bar (1). Place final drive (2) on hull (6). Have helper assist.
9.
Put antiseize compound on threads of 17 screws (4). Secure final drive (2) to hull (6) with 17 screws and washers (5).
10. Tighten 17 screws (4) to 75-85 lb-ft (102-115 Nm) torque.
11. Remove final drive lifting bar (1). Install drive sprocket assembly (WP 0357 00).
FOLLOW-THROUGH STEPS
1.
Connect track (see your -10).
2.
3.
Install left or right center floor plate (WP 0394 00) or (WP 0395 00).
4.
Road test carrier (WP 0128 00) to check final drive for proper operation.
END OF TASK
0326 00-4