TM 9-2350-247-20-2
REPLACE POWER PLANT WIRING HARNESS (M548A3) -- Continued
0298 00
8.
Connect circuit 6 lead (1) to starter solenoid terminal (2). Secure with nut (3).
9.
Connect circuit 1B lead (4) to voltage regulator receptacle (5).
10. Connect wiring harness connector P2 (6) and wiring harness connector P3 (7) to receptacles on battery box bulkhead in
carrier.
11. Install wiring harness (8), clamp (9), two washers (10), screw (11), and new lock nut (12) on bracket (13) on power plant.
0298 00-9